• Home
  • Services
    • SAP Calculation >
      • SAP Calculation for New Build Dwelling
      • SAP Calculation for Conversion
      • SAP Calculation for Extension
    • Water Efficiency Calculation
    • Air Permeability Test
    • Sound Test
    • Ventilation Test
    • Overheating Assessment
    • SBEM Calculation
    • U-Value Calculation
  • Quote
  • FAQ
  • About
    • About
    • Areas We Cover
  • Contact
  • Home
  • Services
    • SAP Calculation >
      • SAP Calculation for New Build Dwelling
      • SAP Calculation for Conversion
      • SAP Calculation for Extension
    • Water Efficiency Calculation
    • Air Permeability Test
    • Sound Test
    • Ventilation Test
    • Overheating Assessment
    • SBEM Calculation
    • U-Value Calculation
  • Quote
  • FAQ
  • About
    • About
    • Areas We Cover
  • Contact
SAP Company
  • Home
  • Services
    • SAP Calculation >
      • SAP Calculation for New Build Dwelling
      • SAP Calculation for Conversion
      • SAP Calculation for Extension
    • Water Efficiency Calculation
    • Air Permeability Test
    • Sound Test
    • Ventilation Test
    • Overheating Assessment
    • SBEM Calculation
    • U-Value Calculation
  • Quote
  • FAQ
  • About
    • About
    • Areas We Cover
  • Contact
SBEM Calculation for new commercial buildings to demonstrate Part L2 building regulation compliance.

​SBEM Calculation . BRUKL Report . EPC . Part L2

Get Quote

SBEM Calculations for commercial new-builds, conversions and extensions in England​

All new commercial buildings must comply with Part L2 of the Building Regulations. Compliance is demonstrated using the Simplified Building Energy Model (SBEM) calculation tool.

Design Stage

The design-stage SBEM calculation must be completed and submitted to your Building Control Body or Approved Inspector alongside your Building Control Application.
SBEM BRUKL
As-Built Stage

The as-built SBEM calculation is completed once construction is finished. A Certificate of Compliance is produced for building control, reflecting any changes from the design stage and incorporating details unavailable at that time, such as the air pressure test result. The BRUKL (Building Regulations UK Part L) report generated through SBEM demonstrates that a new building complies with Part L2a of the UK Building Regulations, or Part L2b for conversions or extensions of existing buildings. Once complete, we can also produce the on-construction EPC.

How Our SBEM Calculations Work

Our SBEM calculations are carried out off-plan, with no site visits required. To complete your assessment, we ask for:

  • Detailed floor plans and building layouts
  • Full building specifications
  • Construction notes

Providing this information upfront ensures a fast, accurate, and compliant SBEM calculation for your project.

If you would like a quote for a SBEM Calculation, please complete the form below...

    Max file size: 20MB
    Max file size: 20MB
    Max file size: 20MB
    Max file size: 20MB
    Please read our Privacy Policy and Terms & Conditions.
Submit

Services

SAP Calculation
- New Build Dwelling
- Conversion
​- Extension

Water Efficiency Calculation
Air Permeability Test
Sound Test
​Ventilation Test
​Overheating Assessment
​SBEM Calculation
U-Value Calculation

Company​

Contact
About
Areas We Cover
Privacy Policy
​Terms & Conditions
​
Site Map
Google Reviews
Elmhurst Approved Energy Assessor certification logo for SAP and energy compliance.
Better Buildings Consultant accreditation confirming expertise in sustainable building design

Contact​

​e: [email protected]
​t: ​07498 203953

U-Value Competency Scheme Member badge
SAP Company is a trading name of SAP Company Network Ltd. 
​Registered Company in England | Company Number:  13181161  | Waterloo House, 15a Duke Street, Dartmouth TQ6 9PY
Copyright © 2026 All Rights Reserved | Tel: 07498 203953
.